Project Name: Bandar Abbas Refinery Debottlenecking Project

Activities : Implementation of the project in the from of EPC , including review of basic design, detailed design, supply and provision of equipment, performing construction work, and installing equipment, towards increasing the capacity of the Refinery.

Objective: Project is planned and controls by implementing latest Developed procedures. Modern simulation softwares are used to design of various process units all data documents and drawings in this project will be in electronic files and internal circulation of documents will be done paperless as much as possible.

Partners: Oil Design and Construction Co. (ODCC) and International General Contractor (IGC)

Project Duration: Two years

Type of Contract: EPC

Location: Bandar Abbas

Client : National Iranian Oil Engineering Construction Co.( NIOE&C ) .