Project name: South Azadegan Oil Field Development – North Wellhead Facilities and Flow Lines

Activities:

Detailed Engineering, Procurement, Construction, Pre-Commissioning and Commissioning for North Wellhead Facilities and Flow Lines in South Azadegan Oil Field.

Objective:

  • South Azadegan oil field development and transferring Crude oil to oil & gas separator in north area of South Azadegan oil field.
  • 59 wellheads allocating in 28 wellpads are included in scope of this project and production capacity is 129.000 BPD (from 360.000 BPD in South Azadegan oil field).

Project duration: 20 Months

Type of contract: EPC

Location: Khoozestan – Ahwaz – South Azadegan

Client: Petroleum Engineering and Development Co. (PEDEC)